NEW MEETING COMPLEX THE NATIONAL ASSEMBLY OF SURINAME
PROJECT NAME NEW MEETING COMPLEX DE NATIONALE ASSEMbLy VAN SURINAME CCE was responsible for the design of the technical installations of this building: Design lighting installation. Design electrical installation. Design of water-flow supply, water tank and pump installation Design air conditioning and ventilation installation. Design audiovisual installation. Design fire alarm & suppression system Design security […]
DESIGN AND INSTALLATIONS FOR HARD ROCK CAFé AT INTERNATIONAL MALL OF SURINAME
Hard Rock Cafe International Mall of Suriname The work carried out by CCE in connection with this project was as follows: Design gas installation Design of water-flow supply, water tank and pump installation Design electrical cabling and fuse boxes.
Parking and Entrance Design for Lucky Store: Domineestraat & Neumanpad
PARKING AND ENTRANCE DESIGN FOR LUCKY STORE: DOMINEESTRAAT & NEUMANPAD Design of parking and entrance steps for Lucky Store, Domineestraat & Neumanpad The work carried out by CCE in connection with this project was as follows: Recording on the site Designing the detailed design drawings for the parking spots and entrance stairs Preparation of a […]
Building Three Facilities at Anton de Kom University
Construction of three facilities within the area of the Anton de Kom University (Phase One) CCE was responsible for the design of the technical installations for: Student dormitories Type I: 1 Building of 3 stories, 24 double-bed rooms on each floor, in total 72 rooms. Type V: 1 Building of 4 stories, with 10-12 four-bed […]